Hydropower-Feasibility Study & Detail Designs

1. Feasibility Study of Irkhuwa Khola B Hydropower Project (17.3 MW)
Client:  Barah Multipower (P.) Ltd.
Location:  Bhojpur
Status:  Completed on Dec 2014
 
 
2. Feasibility Study and Detail Design of Chisang Khola A Small Hydropower Project (1.8 MW)
Client:  Chisang Hydropower (P.) Ltd.
Location:  Morang
Status:  Completed on Sept 2014
 
 
3. Feasibility Study of Hydropower component for Rani Jamara Kularia Irrigation project (4.8 MW)
Client:  Rani Jamara Kularia Irrigation Project
Location:  Kailali
Status: Completed on March 2014
 
 
4. Feasibility Study of Upper Maya Khola Small Hydropower Project (5 MW)
Client:  Waleng Tumhok Hydropower (P.) Ltd
Location:  Sankhuwasabha
Status:  Completed on July 2013
 
 
5. Feasibility Study of Hadi Khola (Sunkoshi A) Small Hydropower Project (997 kW)
Client:  Century Energy (P.) Ltd.
Location:  Sindupalchowk
Status:  Completed on April 2013. 
 
 
6. Feasibility Study of Rasuwa Bhotekoshi Hydropower Project (97.5 MW)
Client:  Langtang Bhotekoshi Hydropower Company (P.) Ltd.
Location:  Rasuwa
Status: Completed on September 2012
 
 
7. Due deligence and Review on Feasibility Study of Upper Lapche Khola Hydropower Project (75 MW)
Client:  Energy Venture (P.) Ltd.
Location:  Dolakha
Status:  completed on February 2013
 
 
8. Feasibility Study of Nishi Khola Small Hydropower Project (3.5 MW)
Client:  Dhorpatan Hydropower (P.) Ltd.
Location:  Baglung
Status:  Completed on March 2012
 
 
9.  Feasibility Study of Taman Khola Small Hydropower Project (4.85 MW)
Client:  Taman Hydropower (P.) Ltd.
Locatioin:  Baglung
Status:  Completed on June 2011
 
 
10. Feasibility Study of Tinau I Small Hydropower Project (2.4 MW)
Client:  Satyawoti Hydropower Company (P.) Ltd.
Location:  Palpa
Status:  Completed on December 2011
 

Testimonials